Sept 30,2015
I am a new customer with Trinity and thrilled with my first month's results! (Sept 2015)
Spencer Flint signed me up the last week in June and had the system scheduled for installation the 3rd week in August. I received a call from Trinity the last week in July saying they could do the installation the first week in August if I wanted. (2 weeks early) They had the job finished in two days and after sign offs, I was up and running the 3rd week in August. When National grid swapped out the meter my system went dead. I called Spencer and within 10 minutes someone was on the phone with me trying to solve the problem. Spencer had someone there the next morning and the system was back online. Great communication and follow-up!
I was told that I should receive at least 62% of my power from my solar panels. September is my first full month and I have produced 818 KWh as of today. My meter from National Grid is -56 from their last reading. I know that Sept was a very sunny month, but all my power came from solar for this month.
Thank you for the excellent service, Spencer! Great job Trinity!
Marc P